The Capstone Project is the final stage of the course and brings together all the technical skills you develop along the way. You will build a complete EVM control system for a real technical project, from setting the baseline to proposing corrective actions, applying professional earned value analysis methods.
The project includes defining the Work Breakdown Structure for the assigned project, setting the cost baseline with professional criteria, configuring the physical progress measurement system, and simulating several reporting periods. You will calculate the EVM indicators (PV, EV, AC, CPI, SPI, CV, SV, TCPI) for each period, build EAC and ETC forecasts with different methods, analyze variance trends, and design an executive project dashboard.
It also includes root cause analysis of the variances detected, data-driven corrective action proposals with their expected impact, and an executive project status report. The final documentation must meet the technical level and professional format expected of PMO reports at industry companies, showing that you can implement complete, rigorous EVM control systems ready for real professional use.