The Capstone Project is the culminating stage of the training and represents the practical integration of every technical competency developed during the program. It consists of the complete development of a solar thermal DHW installation, from demand analysis through the preventive maintenance specification, applying the professional methodologies and calculation tools used in the industry.
The project is built on a representative building (multifamily residential, hotel, sports facility, or similar) where you calculate the DHW energy demand by occupancy and use, determine the applicable solar contribution target, and size the complete installation. You will select the solar collectors with justified area, orientation, and tilt, design the storage system with the right volume and configuration, specify heat exchangers and circulation pumps with pressure drop calculations, and define the differential control system with freeze and Legionella protection.
The work also includes the installation’s schematic diagram, the specification of safety and expansion devices, the hydronic circuit design with compatible materials, and the preventive maintenance plan. The final documentation must be delivered at the technical level and professional format demanded by permit submittals, including compliance documentation produced with approved software, demonstrating your ability to prepare a complete technical package that meets the sector’s permitting requirements.